The range
The gauge holds the track, transfers the loads to the ballast bed, and significantly determines how long a track can remain in place. Which material is the right one depends on the load, installation conditions, subgrade, and budget.
We supply rail, track, and bridge guardrails made of concrete, wood, plastic, and steel, new and used, and refurbished.








For the track section.
In the different lengths of a switch assembly.
For bridge structures, if requested, processed according to milling and planning schedules.
The concrete sleeper is the standard sleeper in modern track layout. Its high dead weight ensures very good positional stability, it is low-maintenance and achieves a long service life. It is used predominantly in continuous track with high loads.
We supply concrete sleepers, new and used, as track and switch sleepers, in all dimensions and types.
Below these, the prestressed concrete sleeper types common in the Deutsche Bahn network, ranging from the B 70 W and B 90 W to the newer B 01 and B 07, as well as the wide sleeper BBS 1.


The wooden threshold is a classic in the upper construction and is advantageous there where elasticity is required, special lengths are needed, or individual thresholds need to be replaced in the existing structure. It is easy to process, relatively lightweight, and tolerates irregularities in the subfloor.
We offer new wooden thresholds in various wood types and impregnation methods, depending on the customer’s needs. In our Belgian plant, the processing and impregnation are Leuze-en-Hainaut carried out in accordance with TL-DB918144, DIN 68811 and DIN 68800 using modern impregnation oils and protective salts.
If needed, we also offer refurbished and used wooden thresholds. In this case, the old holes are deburred and then the support area for the rib plates is newly milled. Finally, new holes are drilled and reinforced according to customer specifications.


A complete change of barriers is costly and leads to a blockage of the railway for a certain period of time. With InsideFume®, we repair wooden barriers directly in the installed state on the railway. The active substance spreads itself into the barrier and fights fungal, bacterial and insect infestations from the inside out. Subsequently, we guarantee an additional service life of eight years.
Rail, track, and bridge handrails are suitable for all types of wood, whether impregnated or not. We will first determine whether a handrail is suitable by conducting a condition assessment.
Step 1 of 3
Five holes per threshold, 18 millimeters in diameter, 14 centimeters deep. The shavings are completely sucked out.
After the treatment, we guarantee an additional period of use of the wooden slats of eight years.
Up to three further intervals of eight years each are possible.
Can be implemented during the shutdown period or during ongoing operation.
Practicing for over 20 years, licensed in accordance with European biocide legislation.
Plastic sleepers combine the workability and low weight of the wooden sleeper with a very long service life. They are impervious to moisture, fungal decay and insect infestation, and can be sawn, drilled and milled just like wood.
We offer all types of plastic barriers for the rail, track and bridge sectors.
We hold the German Railway manufacturer product qualification (HPQ) for drilling and mounting plastic skirting boards.





The steel beam is one of the most durable, least-maintenance components in the superstructure. Thanks to its robust material properties, it is suitable for a wide range of applications in rail and switchyard construction.
We offer new steel guardrails for the rail and track area, with welded rib plates for various rail profiles.
We take back used steel railings, inspect them and reintroduce well-preserved railings as a cost-effective alternative to the market.


In addition to our standard sizes, we also support you with special requests. With our many years of experience and a strong network, we can also supply sizes that are not part of the standard range.
Next step