Sleepers

The range

Four sleeper types, new and refurbished

The sleeper maintains the track gauge, transfers the load of the vehicles into the ballast bed and largely determines how long a track can remain in service. Which material is the right one depends on the load, installation situation, subgrade and budget.

We supply concrete, timber, plastic and steel track, switch and bridge sleepers, both new and reconditioned. And we process them: in Marl-Sinsen, a sleeper milling machine, a planing and drilling unit and a plate-fastening facility are available for this purpose.

Types of sleeper

According to the installation location, we distinguish between three types of threshold. Each is available in all four materials.

Railway sleepers

For the continuous through track.

points and crossings sleepers

In the different lengths of a switch assembly.

bridge sleepers

For bridge structures, if requested, processed according to milling and planning schedules.

concrete sleeper

The concrete sleeper is the standard sleeper in modern track layout. Its high dead weight ensures very good positional stability, it is low-maintenance and achieves a long service life. It is used predominantly in continuous track with high loads.

New and used

We supply concrete sleepers, new and used, as track and switch sleepers, in all dimensions and types.

Common designs

Below these, the prestressed concrete sleeper types common in the Deutsche Bahn network, ranging from the B 70 W and B 90 W to the newer B 01 and B 07, as well as the wide sleeper BBS 1.

timber sleeper

The wooden sleeper is the classic choice in track superstructure and has the advantage where elasticity is required, where special lengths are needed, or where individual sleepers are being replaced in existing tracks. It is easy to work with, comparatively lightweight, and forgives irregularities in the subgrade.

Wood is also the material with which our company started back in 1929.

reprocessing

We supply new wooden sleepers both treated and untreated, and we recondition used sleepers in Marl-Sinsen: milling, drilling, and plating.

contract impregnation

Under our Belgian contract in Leuze-en-Hainaut, wage impregnation is carried out in accordance with DIN 68811 and DIN 68800 using modern impregnating oils and protective salts.

From our warehouse

wooden railway sleepers

Wooden railway sleepers are also part of our product range. Whether track sleepers made of beechwood or switch sleepers made of oak: send us your enquiry and you will receive a tailored quote shortly.

Custom enquiry

plastic threshold

Plastic sleepers combine the workability and low weight of the wooden sleeper with a very long service life. They are impervious to moisture, fungal decay and insect infestation, and can be sawn, drilled and milled just like wood.

Where it is worthwhile

They are especially interesting as bridge sleepers, in switch areas and wherever changing sleepers would be complex or expensive.

From stock Marl-Sinsen

We supply plastic sleepers for tracks, switches, and bridges and keep them in stock in Marl-Sinsen.

Common types in the Deutsche Bahn network

TypeWeight kgFor railsfeatureOnline since
B 70 Wapprox. 30460 E2 · 54 E4 / 49 E5ballasted track design threshold1970
B 70 Wo60 E2 · 54 E4 / 49 E5as B 70 W, without rail inclination1985
B 70 So Wapprox. 30860 E2 · 54 E4 / 49 E5with soling1996
B 70 W-2.4c. 284Length 2400 mm1998
B 75 W-300approx. 450weighed without rail fastening1996
B 90 Wapprox. 35560 E2 · 54 E4heavier design1990
B 90 So Wc. 33760 E2 · 54 E4weighed with soles, without fastening2002
BBS 1 Wc. 574wombat hump1996

Type overview according to „Concrete sleepers, slab track and components in the network of Deutsche Bahn AG", 3rd edition 2025, published by the German Concrete Sleeper Industry Association (Betonschwellenindustrie e.V.). The weights are pre-assembled guide values; in case of doubt, the regulations and approved drawings of DB InfraGO AG shall apply.

steel sleeper

Steel sleepers are primarily used in industrial and private sidings, as well as in mining and industrial railways. They are fully recyclable, have a compact installation volume and are easy to readjust.

Next step

Request thresholds

Tell us the sleeper type, material and quantity, and we will check stock and procurement.

Further processing

have thresholds adjusted